• Full interior demolition including flooring, kitchen, and bathrooms
• Removal and disposal of all demolition debris
• Subfloor preparation throughout the home
Hallway Bathroom Remodel
• New 42-inch vanity installed
• New sink, tub, and shower plumbing fixtures
• New bathtub installation with waterproofing
• New toilet installation
• New mirror and vanity light
• New bathroom vent fan vented to exterior
• New bathroom accessories including towel bars and hardware
Primary Bathroom Remodel
• New shaker-style double-sink vanity
• Two new faucets installed
• New mirrors and vanity lighting
• Removal of all existing wall mirrors
• New walk-in shower installation
• Waterproofing of shower walls
• Hot-mopped shower floor
• New shower drainage system
• Upgraded shower mixing valve and trim
Flooring
• Luxury vinyl plank flooring installed throughout the home
• Subfloor leveling and preparation
• New baseboards installed
• Flooring transitions and trim installed
• Final quality check and cleanup
Kitchen Remodel
• Full kitchen demolition
• New shaker-style cabinets installed
• New cabinet hardware installed
• New quartz countertops installed
• New kitchen sink and faucet
• New garbage disposal
• New plumbing connections including P-trap and angle stops
• Quartz backsplash installed
• New appliance package including dishwasher, refrigerator, stove, and microwave hood
Interior Painting
• Full interior paint including walls, ceilings, trim, and doors
• Surface prep including patching, sanding, and priming
• Two-coat paint application
• Fireplace painted
• Final walkthrough and touch-ups
Exterior Improvements
• Full exterior paint
• Pressure washing and surface prep
• Caulking, sealing, and spot priming
• Two-coat exterior paint application
• Exterior doors and trim painted
Windows and Doors
• Removal of all existing windows and sliding doors
• Installation of new vinyl windows
• Installation of new sliding glass doors
• Waterproof sealing around all openings
• Operation and lock testing
• Disposal of removed materials
Front Door
• Removal of existing front door
• Installation of new front door
• New front door hardware installed
• Weather sealing and trim touch-ups
Electrical
• All electrical outlets and switches replaced
Safety & Code Compliance
• New smoke detectors installed
• New carbon monoxide detectors installed
• Code-compliant placement and testing
Permits & Inspections
• All required permits obtained
• Architectural and building plans completed
• Final city inspections completed and approved
• Inspector-required electrical upgrades completed